Work principle:
1) Two H-shaped steels are placed at 45-degree boat-shaped welding position on the workpiece holder which inside the guide rail ;
2) The gantry walks on the guide track at the adjusted welding speed;
3) Two sets of submerged arc welding are used to weld two weld seams simultaneously;
4) The arc guide frame is used to automatically track the weld seam;
5) Adopt automatic flux delivery and recovery system.